av五月婷婷_91香蕉视频免费在线观看_我爱av好色_国产精品极品白嫩在线观看_亚洲AV无码片在线播放仙踪林_狠狠撸在线视频

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 兴隆县| 闻喜县| 南安市| 日土县| 眉山市| 普宁市| 丰都县| 清镇市| 永平县| 太仆寺旗| 鹤峰县| 白山市| 石棉县| 伊金霍洛旗| 南康市| 富顺县| 鹿泉市| 宜宾市| 西安市| 榆社县| 宁波市| 巍山| 孟州市| 南昌市| 苗栗市| 临猗县| 饶平县| 阜新市| 丰宁| 西华县| 沈丘县| 色达县| 图木舒克市| 集安市| 佛山市| 临泽县| 邵武市| 望城县| 马公市| 鸡东县| 沙河市|